September 4, 2025
Fulcrum Construction
1945 The Exchange SE, Suite 400
Atlanta, GA 30339
Attn: Jennifer Rinne
470-253-7173
jrinne@fulcrumconstruction.com
Re: Dickโs Sporting Goods HOS, Sarasota, FL
Plumbing SCOPE OF WORK
Plumbing Plans, P0.0, P0.1, P1.0, P1.1, P1.2, P2.0, P2.1, P3.0, P3.1, P3.2, P4.0, dated (No date)
Fixtures, Acessories, and Drains
1 BP
2 ESP-1
3 EWC-1
1 EWC-2
1 EWC-3
4 EWCC
1 EWC-C
8 FCO
13 FD
1 GCO
1 HB
5 LAV-1
7 LAV-2
4 LAV-3
5 RD1
4 RD2
2 RP-1&2
1 SK
5 SS
4 UR-1
8 WC-1...
7 WC-2....
17 WCO
2 WH.
1 WHE-1
1 WHE-2.
1 WHE-3
1 WHE-4
1 WHE-5
Materials
All drain, waste, and vent piping below ground to be SCH 40 PVC pipe and fittings.
All, waste, and vent piping Above ground to be Sch 40 PVC pipe and fittings.
All water piping to be CPVC pipe and fittings.
All Hot, water piping to be insulated.
Exclusions
Trench Drain
Grease traps
Any Seismic restraints
2-1/2โ BFP and meter for Domestic Main by others.
Any dewatering
Demolition work.
Composite Labor, Broom sweep of floors & Dumpster charges.
Drywall access doors for ceilings or walls.
Housekeeping pads (By others).
Concrete cutting & coring, removal &.
Protection of Materials & Equipment following installation.
Asbestos Work of any kind.
Ceiling removal or replacement, or repair of grid.
Fireproofing repairs or back charges.
Structural & Supplemental Steel framing, and Platforms.
X-ray of floor slabs or roof deck.
Painting of mechanical and plumbing systems (By others).
Roofing work or cutting of roof.
LEEDS certification excluded.
Buy America Act domestic requirement.
Davis Bacon Wages Federal wage.
Bond is excluded if needed add 2%.
Overtime, premium time, & shift work.
Note: Opening of ceilings, walls, and floors by others.
This proposal is good for thrty (30) days.
Respectfully,
David Crosby
Estimator
estimating@bbproplumbing.com