Floor & Decor (Venice)

New Build Plumbing Project
Location: 4411 South Tamiami Trail Venice, FL
Completion Date: December 2024

We recently performed the plumbing scope for this new construction Floor & Decor in Venice. Our contract included the installation of water closets, lavatories, drains, carriers, cleanouts, water heaters, piping, and insulation. The contract we signed did exclude demolition, structural, roof, fireproofing, asbestos, and concrete work. The piping included copper and cast iron, fixture setting, and condensate drains. One year labor warranty included. Here’s a more detailed outline…

Scope of Work:

  • Water closets (WC-1) – wall mount, flush valve

  • Urinals (UR-1) – wall mount, flush valve

  • Lavatories (LAV-1, LAV-2) – drop-in and wall-hung

  • Sinks (S-1, FMS, FS-1) – mop sink, floor sink, countertop

  • Carriers – lavatory (CLAV), urinal (CUR), single/double vertical (CWSV, CWDV)

  • Water heater (HWH-1) – electric

  • Ice maker box (IMB)

  • Hose bibbs (HB-1, HB-2)

  • Roof drains (RD-1, RD-2)

  • Roof hydrant (RH-1)

  • Floor drains (FD-1)

  • Floor cleanouts (FCO), wall cleanouts (WCO, WCO-1), grade cleanout (GCO-1)

  • Expansion tank (ET-1)

  • Recirculation pump (RP-1)

  • Water cooler (EWC-1) with cooler carrier (EWCC)

  • Water hammer arrestors (WHA, WHA-C)

  • Trap primer (TP-1)

  • Trench drain (TD-1) – 24FT, end-to-end, cut drain

  • Gas unit heater (GUH-2)

  • Gas flexible connection (GASF)

  • All below-ground DWV piping – SCH 40 PVC

  • All above-ground DWV piping – cast iron

  • All water piping – copper

  • All hot water piping – fiberglass insulation

  • Gas piping – black steel

  • Condensate drain lines from RTUs – trap by HVAC sub

  • One-year workmanship warranty

  • Permit sign-on with fees by general contractor


Exclusions / Clarifications

  • Seismic restraints

  • Dewatering

  • Roof work

  • Structural work

  • Housekeeping pads

  • Asbestos work

  • Ceiling work

  • Fireproofing

  • X-ray services

  • Painting

  • Concrete work

  • Demolition work

  • Composite labor, broom sweep, dumpster charges

  • Drywall access doors

  • Protection of fixtures/equipment after installation

  • LEED certification

  • Buy America Act domestic requirement

  • Davis-Bacon wages

  • Bond (add 2% if required)

  • Overtime, premium time, shift work